The Application

The modified circuit 4a, in addition to Figure 4 includes an analysis of state production before issuing a certificate of conformity for products. Use when impractical to carry out an inspection does not control. At Coinbase you will find additional information. Figure 5 – the most difficult. It consists of a prototype test, test production through the certification of quality assurance or certification of the production itself, a more rigorous inspection control, which takes place in two forms: as a test of samples of certified products, selected from the seller and the manufacturer, and in addition – as a test of the stability conditions of production and acting quality management system. Figure 6 confirms once again how profitable the company a quality system certificate. The fact that this scheme is to evaluate the company operating the quality system certification body, but if the certificate on the system the company already has, it is enough submit the application declaration. It is usually found in the rules of certification of homogeneous production. Schemes 5 and b wise to choose when imposed stringent requirements for increased stability characteristics of manufactured goods, the company is engaged in the differentiation of the products, the consumer has made installation (assembly) of the product when a small shelf life, and the actual volume of sample (sample) insufficient for reliable rezuultatov tests.

Figure 7 is a trial shipment. This means that a lot is made now, according to the rules shown in the sample average (sample) which is being tested in an accredited laboratory, followed by a certificate issuing procedure. Inspection control is not performed. Figure 8 provides a test of each product manufactured enterprise, an accredited testing laboratory and then a decision by the certification body to issue a certificate of conformity. In addition to these existing schemes in Russia introduced additional schemes 9-10a based on application-declaration by the manufacturer, followed by inspection for the control of the certified products. This principle of the certification scheme is most suitable for small businesses and goods produced in small batches. Figure 9 is intended for products produced irregularly, with fluctuating nature of demand, when supervisory control is not appropriate, this may be products of domestic manufacturers in including sole proprietors who have registered their activities. Schemes 10 and 10a shall apply for certification of products made in small batches, but over a long period of time. Data scheme used in the mandatory certification and voluntary certification.

Tags: ,